Hex Nut 3 Types【1-10,000 Pieces Per Package】 (HNT3-STCB-M6)

Hex Nut 3 Types HNT3-STCB-M6
  • Promotional pricing ends 31/12/2024
  • Volume Discount

Product Details:

Manufacturer part number: HNT3-STCB-M6

Brand: SUNCO

Price: 2.59

Delivery time: 6 Days


Technical Data:

Screw Nominal (M): 6

Material: -

Surface Treatment: Chromate Plating

Sales Unit: Box/Package

Surface Treatment (Details): [Chromate Plating] Black Chromate


Part Number

Once your search is narrowed to one product,
the corresponding part number is displayed here.

HNT3-STCB-M6

Part Number
HNT3-STCB-M6
Part Number
Standard Unit Price
Minimum order quantityVolume Discount
Standard
Shipping Days
?
RoHSScrew Nominal (M) Material Surface Treatment Sales Unit Surface Treatment (Details)

2.59 €

1 Available 6 Days -6-Chromate PlatingBox/Package[Chromate Plating] Black Chromate

Loading...

  1. 1

Basic information

Thread Type Metric Coarse Applications, Functions Standard Hex Nut Type Type 3

This page is Hex Nut 3 Types, part number HNT3-STCB-M6.
You can find the detail information about specifications and dimensions on part number HNT3-STCB-M6.

Variation of this product

Part Number
HNT3-310S-M16
HNT3-310S-M18
HNT3-310S-M20
HNT3-STCB-M8
HNT3-STCG-M10
HNT3-STCG-M12
Part NumberStandard Unit PriceNumber of pc(s). included in pkg.Minimum order quantityVolume DiscountStandard
Shipping Days
?
RoHSScrew Nominal (M) Material Surface Treatment Sales Unit Surface Treatment (Details)

931.21 €

130 Pieces Per Package

1 pack 6 Days 1016-[Not Provided] N/ABox/Package[Not Provided] N/A

1,200.42 €

90 Pieces Per Package

1 pack 6 Days 1018-[Not Provided] N/ABox/Package[Not Provided] N/A

1,112.95 €

80 Pieces Per Package

1 pack 6 Days 1020-[Not Provided] N/ABox/Package[Not Provided] N/A

64.91 €

800 Pieces Per Package

1 pack Available 6 Days -8-Chromate PlatingBox/Package[Chromate Plating] Black Chromate

58.57 €

400 Pieces Per Package

1 pack Available 6 Days -10-Chromate PlatingBox/Package[Chromate Plating] Green Chromate

61.72 €

300 Pieces Per Package

1 pack 15 Days -12-Chromate PlatingBox/Package[Chromate Plating] Green Chromate

Tech Support