No. 0 Type 2 Phillips Pan Head Screw【2,000-10,000 Pieces Per Package】 (CSPPN2-STH-M2.6-6)

No. 0 Type 2 Phillips Pan Head Screw CSPPN2-STH-M2.6-6
  • Promotional pricing
  • Volume Discount

Product Details:

Manufacturer part number: CSPPN2-STH-M2.6-6

Brand: SUNCO

Price: 142.70

Delivery time: 15 Days


Technical Data:

Screw Nominal (M): 2.6

Length L (mm): 6

Surface Treatment: [Chrome Plating] Chrome Plated


Part Number

Once your search is narrowed to one product,
the corresponding part number is displayed here.

CSPPN2-STH-M2.6-6

Part Number
CSPPN2-STH-M2.6-6
Part Number
Standard Unit Price
Number of pc(s). included in pkg.Minimum order quantityVolume Discount
Standard
Shipping Days
?
RoHSScrew Nominal (M) Length L (mm) Surface Treatment

142.70 €

5,000 Pieces Per Package

1 pack 15 Days 102.66[Chrome Plating] Chrome Plated

Loading...

  1. 1

Basic information

Detailed Shape Pan Mounting Hole Shape Phillips Head Thread Type Metric Coarse
Basic Shape Standard (Round) Sales Unit Box/Package Application Standard

This page is No. 0 Type 2 Phillips Pan Head Screw, part number CSPPN2-STH-M2.6-6.
You can find the detail information about specifications and dimensions on part number CSPPN2-STH-M2.6-6.

Variation of this product

Part Number
CSPPN2-ST3B-M1.4-3
CSPPN2-ST3B-M1.4-3.5
CSPPN2-ST3B-M1.4-4
CSPPN2-STH-M2.6-8
CSPPN2-STH-M2.6-9
CSPPN2-STN-M1.4-10
Part NumberStandard Unit PriceNumber of pc(s). included in pkg.Minimum order quantityVolume DiscountStandard
Shipping Days
?
RoHSScrew Nominal (M) Length L (mm) Surface Treatment

86.33 €

5,000 Pieces Per Package

1 pack 6 Days 101.43[Trivalent Chromate] Trivalent Black

141.97 €

10,000 Pieces Per Package

1 pack 15 Days 101.43.5[Trivalent Chromate] Trivalent Black

141.97 €

10,000 Pieces Per Package

1 pack 6 Days 101.44[Trivalent Chromate] Trivalent Black

142.70 €

5,000 Pieces Per Package

1 pack 15 Days 102.68[Chrome Plating] Chrome Plated

142.86 €

5,000 Pieces Per Package

1 pack 15 Days 102.69[Chrome Plating] Chrome Plated

83.27 €

5,000 Pieces Per Package

1 pack 6 Days 101.410[Nickel Plating] Nickel Plating

Tech Support