Manufacturer part number: 90TG1.2CB
Brand: IWATA TOOL
Price: 127.33 €
Delivery time: 6 Days
blade diameter: 1.2 mm
shank diameter: 3 mm
Overall Length L: 40 mm
Maximum Chamfering Width d1: 1.2 mm
Pivot Length: 3.6 mm
Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
90TG1.2CB
Part Number
|
---|
90TG1.2CB |
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | blade diameter (mm) | shank diameter (mm) | Overall Length L (mm) | Maximum Chamfering Width d1 (mm) | Pivot Length (mm) | Drawing | |
---|---|---|---|---|---|---|---|---|---|---|
127.33 € | 1 | 6 Days | 1.2 | 3 | 40 | 1.2 | 3.6 | 2 |
Loading...
Application | Centering (Positioning) / Hole Chamfer / Chamfering/Horizontal / V Groove | Both square (θ) | 90 | work material | General Steel / Aluminum / Copper / Resin |
---|---|---|---|---|---|
Single blade, two blades | Single blade | Peripheral Blade Y/N | N/A | Tool Material Type | Carbide |
Coating Y/N | N/A | Rotation Direction | Right blade |
This page is Toglon Sharp SP 90° Carbide, part number 90TG1.2CB.
You can find the detail information about specifications and dimensions on part number 90TG1.2CB.
Configure
Basic Attributes
Type
blade diameter(mm)
shank diameter(mm)
Overall Length L(mm)
Maximum Chamfering Width d1(mm)
Pivot Length(mm)
Filter by standard shipping days
Optional Attributes
Part Number |
---|
90TG10CB |
90TG12CB |
90TG16CB |
90TG2CB |
90TG3CB |
90TG4CB |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Standard Shipping Days ? | blade diameter (mm) | shank diameter (mm) | Overall Length L (mm) | Maximum Chamfering Width d1 (mm) | Pivot Length (mm) | Drawing |
---|---|---|---|---|---|---|---|---|---|---|
151.87 € | 1 | 6 Days | 10 | 10 | 70 | - | - | 1 | ||
193.84 € | 1 | 10 Days | 12 | 12 | 75 | - | - | 1 | ||
275.02 € | 1 | 6 Days | 16 | 16 | 80 | - | - | 1 | ||
101.46 € | 1 | 8 Days | 2 | 3 | 40 | 2 | 6 | 2 | ||
79.43 € | 1 | 6 Days | 3 | 3 | 40 | - | - | 1 | ||
79.43 € | 1 | 6 Days | 4 | 4 | 40 | - | - | 1 |